Twitter Gplus LinkedIn RSS
Home » Energy Efficiency Case Studies » Case Study – Client: GSK – GMS Division – Quality Road & Jurong sites – Singapore
formats

Case Study – Client: GSK – GMS Division – Quality Road & Jurong sites – Singapore

 

Benefits:

  • Energy savings delivered  = 2.2m kWhr/pa
  • Energy cost savings = S$347,000
  • Emissions reduction = 985 te CO2
  • Simple pay back = 1.3 years
  • Further energy savings identified = 2.5m kWhr/pa

Facility: Pharma Manufacturing & laboratories

Issue: Very high energy demand driven by original HVAC design & layout

Brief: Reduce energy demand without compromising on Compliance or Laboratory safety

Solution:

  • Reduce existing air change rates
  • Reduce existing fresh air volume
  • Improve plant operational maintenance
  • Optimise BMS system
  • Recommended upgrading laboratory fume cupboards to VAV
  • Recommended upgrade & control of warehousing Facilities

 

Conclusion: EECO2 supported HVAC design review, project scoped out & managed local test & balance & BMS Contractors to complete project – project successfully completed also produced a prioritised Action Plan to implement further savings

To find out more about EECO2 Energy Efficiency Consultants, email info@eeco2.co.uk. To receive regular updates, subscribe to our blog by RSS or Subscribe to EECO2 – Energy Efficiency Consultancy by Email

 
No Comments  comments 

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

© Energy Efficiency Consultancy | Pharmaceutical Energy Efficiency